• Fiery@lemmy.dbzer0.com
    link
    fedilink
    English
    arrow-up
    11
    ·
    1 hour ago

    VP neq VNP doesn’t sound familiar, lemme look it up:

    For sufficiently large matrices, the formal statement claims circuit-size lower bounds growing faster than any fixed power of matrix size for the Hamiltonian cycle polynomial over every field, and for the permanent except in characteristic two, where 1 + 1 = 0.

    well that does not help at all

    • Venator@lemmy.nz
      link
      fedilink
      English
      arrow-up
      3
      ·
      5 minutes ago

      The Hamiltonian cycle is a route for a graph that visits every vertex once and returns to the start. And by matrix size it means the size of the graph.

      And a graph is a way to represent relationships between things mathematically, e.g. a map where roads are edges on the graph, and cities are vertices.

      Circuit size is apparently how many steps a program needs to compute something.

      And the “V” in VP neq VNP comes from Valiant, after Leslie Valiant, who introduced these classes in 1979. The “V” separates them from the Boolean classes P and NP.

      And it’s about weighted graphs, which adds a weight to the edges of a graph so it could represent things like a map where the weights represent the distance of roads between cities.

      So I think it’s something about how if you have a bigger graph, you need an even bigger compute time to find out the total weight of all the possible routes that visits every vertex, and that compute time increases exponentially with every vertex added.

      So in the example where the graph represents a map, if you add more cities, the work needed to total up the distance of every possible round trip visiting every city explodes. No clever shortcut exists.