Want to wade into the snowy surf of the abyss? Have a sneer percolating in your system but not enough time/energy to make a whole post about it? Go forth and be mid: Welcome to the Stubsack, your first port of call for learning fresh Awful you’ll near-instantly regret.

Any awful.systems sub may be subsneered in this subthread, techtakes or no.

If your sneer seems higher quality than you thought, feel free to cut’n’paste it into its own post — there’s no quota for posting and the bar really isn’t that high.

The post Xitter web has spawned soo many “esoteric” right wing freaks, but there’s no appropriate sneer-space for them. I’m talking redscare-ish, reality challenged “culture critics” who write about everything but understand nothing. I’m talking about reply-guys who make the same 6 tweets about the same 3 subjects. They’re inescapable at this point, yet I don’t see them mocked (as much as they should be)

Like, there was one dude a while back who insisted that women couldn’t be surgeons because they didn’t believe in the moon or in stars? I think each and every one of these guys is uniquely fucked up and if I can’t escape them, I would love to sneer at them.

(December’s finally arrived, and the run-up to Christmas has begun. Credit and/or blame to David Gerard for starting this.)

  • fullsquare@awful.systems
    link
    fedilink
    English
    arrow-up
    0
    ·
    1 day ago

    anyone else spent their saturday looking for gas turbine datasheets? no?

    anyway, the bad, no good, haphazard power engineering of crusoe

    neoclouds on top of silicon need a lot of power that they can’t get because they can’t get substation big enough, or maybe provider denied it, so they decided that homemade is just as fine. in order to turn some kind of fuel (could be methane, or maybe not, who knows) into electricity they need gas turbines and a couple of weeks back there was a story that crusoe got their first aeroderivative gas turbines from GE https://www.tomshardware.com/tech-industry/data-centers-turn-to-ex-airliner-engines-as-ai-power-crunch-bites this means that these are old, refurbished, modified jet engines put in a chassis with generator and with turbofan removed. in total they booked 29 turbines from GE, LM2500 series, and some other, PE6000 from other company called proenergy* and probably others (?) for alleged 4.5GW total. for neoclouds generators of this type have major advantage that 1. they exist and backlog isn’t horrific, the first ones delivered were contracted in december 2024, so about 10 months, and onsite construction is limited (sometimes less than month) 2. these things are compact and reasonably powerful, can be loaded on trailer in parts and just delivered wherever 3. at the same time these are small enough that piecewise installation is reasonable (34.4MW per, so just from GE 1GW total spread across 29)

    and that’s about it from advantages. these choices are fucking weird really. the state of the art in turning gas to electricity is to first, take as big gas turbine as practical, which might be 100MW, 350MW, there are even bigger ones. this is because efficiency of gas turbines increases with size, because big part of losses comes from gas slipping through the gap between blades and stator/rotor. the bigger turbine, the bigger cross-sectional area occupied by blades (~r^2), and so gap (~r) is less important. this effect is responsible for differences in efficiency of couple of percent just for gas turbine, for example for GE, aeroderivative 35MW-ish turbine (LM2500) we’re looking at 39.8% efficiency, while another GE aeroderivative turbine (LMS100) at 115MW has 43.9% efficiency. our neocloud disruptors stop there, with their just under 40% efficient turbines (and probably lower*) while exhaust is well over 500C and can be used to boil water, which is what any serious powerplant does in combined cycle. this additional steam turbine gives about third of total generated energy, bringing total efficiency to some 60-63%.

    so right off the bat, crusoe throws away about third of usable energy, or alternatively for the same amount of power they burn 50-70% more gas, if they even use gas and not for example diesel. they specifically didn’t order turbines with this extra heat recovery mechanism, because, based on datasheet https://www.gevernova.com/content/dam/gepower-new/global/en_US/downloads/gas-new-site/products/gas-turbines/gev-aero-fact-sheets/GEA35746-GEV-LM2500XPRESS-Product-Factsheet.pdf they would get over 1.37GW, while GE press announcement talked about “just under 1GW” which matches only with the oldest type of turbine there (guess: cheapest), or maybe some mix with even older ones than what is shown. this is not what serious power generating business would do, because for them every fraction of percent matters. while it might be possible to get heat recovery steam boiler and steam turbine units there later, this means extra installation time (capex per MW turns out to be similar) and more backlog, and requires more planning and real estate and foresight, and if they had that they wouldn’t be there in the first place, would they. even then, efficiencies get to maybe 55% because turns out that these heat exchangers required for for professional stuff are huge and can’t be loaded on trailer, so they have to go with less

    so it sorta gets them power short term, and financially it doesn’t look well long term, but maybe they know that and don’t care because they know they won’t be there to pay bills for gas, but also if these glorified gensets are only used during outages or otherwise not to their full capacity then it doesn’t matter that much. also gas turbines in order to run efficiently need to run hot, but the hottest possible temperature with normal fuels would melt any material we can make blades of, so the solution is to take double or triple amount of air than needed and dilute hot gases this way, which also means these are perfect conditions for nitric oxide synthesis, which means smog downwind. now there are SCRs which are supposed to deal with it, but it didn’t stop musk from poisoning people of memphis when he did very similar thing

    * proenergy takes the same jet engine that GE does and turns it into PE6000, which is probably mostly the same stuff as LM6000, except that GE version is 51MW and proenergy 48MW. i don’t know whether it’s derated or less efficient still, but for the same gas consumption it would be 37.5%

    • YourNetworkIsHaunted@awful.systems
      link
      fedilink
      English
      arrow-up
      0
      ·
      8 hours ago

      You’d think that they’d eventually run out of ways to say “fuck you, got mine” but here we are I guess. I’m going to guess that they’re not subject to the same kinds of environmental regulations or whatever that an actual power plant would be because it’s not connected to the grid?

      • fullsquare@awful.systems
        link
        fedilink
        English
        arrow-up
        0
        ·
        edit-2
        7 hours ago

        why wouldn’t they be subject to emission controls if they’re islanded? anyway they aren’t islanded, they’re using gas turbines to supplement what they can draw from substation or the other way around, either way it’s probably all synchronized and connected, they just put these turbines behind the meter

        i guess they’re not subject to emission controls because they’re in texas and anything green is woke, so they might just not do any of that and vent all the carbon monoxide and nitrogen oxides these things belch. also, no surprises if they fold before emaciated epa gets to them, if republicans don’t prevent it outright that is

        welcome to the abyss, it sucks here

        i mostly meant to point out that it looks like they prioritized delivery speed and minimum construction, while paying top dollar for extra 50-70% fuel so it makes sense short term, and who cares what comes in two years when they’re under. this also means they bought out all gas turbines money can buy. if marine diesels weren’t so heavy these would be next